Leather pouches
Stripe-readyLeather Field Pouch
Durable jobsite pouch for pencils, markers, tags, and small tools.
YKU-LTH-POUCH-001
A connected operations platform for modern field teams. Projects, workers, time, reports, and tools — one ecosystem.
YUKU gives construction and field teams a connected command center for projects, labor, site activity, and operational reporting.
Field ops
Connected
Time tracking
Connected
Reports
Connected
Live ecosystem command
Projects, tasks, photos, files, reports, progress, site activity, and operational evidence.
Active data flow
Bid package, scope groups, material assumptions
Estimate converted into Field project setup draft.
Interactive operations sandbox
Create the Field record, assign the worker, clock in through Time, verify geofence, and generate a combined report preview.
Progress
0%
Notes
0
Photos
0
Worker
Unassigned
North Yard Retrofit
Task Concrete prep inspection
Status draft
Evidence 0 photos
M. Santos
Lead hand
A. Reid
Operator
J. Clarke
Labourer
A website-only simulation inspired by the actual Field Operations Hub: project cards, task inbox, files, photos, chats, workforce status, and project detail.
YUKU Field simulation
Project detail
1240 Industrial Road NW
1
Tasks
4
Notes
6
Files
18
Photos
Concrete prep inspection
Due todayNorth Yard Retrofit
Upload east gate deficiency photos
2D leftGreenStone Entry Package
Review service core access notes
OverdueTower B Service Core
Daily report - North Yard.pdf
M. Santos
Level 02 markup.plan
A. Reid
Gate photo evidence
N. Patel
North Yard Retrofit
M. Santos uploaded photos and tagged the concrete prep task.
Tower B Service Core
Access note converted into a task for the service gate crew.
Operations
Concrete prep inspection
Due todayNorth Yard Retrofit
Upload east gate deficiency photos
2D leftGreenStone Entry Package
Website-only Field preview
A safe demo layer inspired by the actual Time app: Today screen, timer, site selection, GPS confidence, sync status, active workers, and timesheet review.
Today
Off duty
02:10:24
North Yard
North Yard
1240 Industrial Road NW
120m radius · NY-120
M. Santos
Inside radius · 31m
WORKING
02:14:32
A. Reid
Checking GPS
ON ROUTE
00:42:10
Website-only Time preview
YUKU Time simulation
Site selection
North Yard
8 C, clear
Today
4.25h
Week
31.75h
Overtime
1.50h
Admin view of active workers
SavedM. Santos
Foreman · North Yard
Inside radius · 31m
READY
02:14:32
A. Reid
Installer · Tower B
Checking GPS
ON ROUTE
00:42:10
J. Clarke
Supervisor · Service Gate
Outside radius · 184m
REVIEW
07:48 total
Timesheet preview
M. Santos
North Yard
4h 18m
pendingA. Reid
Tower B
7h 42m
approvedJ. Clarke
Service Gate
8h 12m
flaggedThese are local placeholder slots only. Real Android and iOS screenshots can be added later after removing user, company, project, GPS, and invite data.
YUKU Field Operations Hub
Future sanitized Android screenshot slot for projects, tasks, files, chats, and workforce.
/screenshots/field-android-placeholder.png
YUKU Field Project Detail
Future sanitized iOS screenshot slot for project detail, photos, notes, and reports.
/screenshots/field-ios-placeholder.png
YUKU Time Today
Future sanitized Android screenshot slot for today, timer, site selection, GPS, and sync state.
/screenshots/time-android-placeholder.png
YUKU Time Timesheets
Future sanitized iOS screenshot slot for admin timesheet review and export controls.
/screenshots/time-ios-placeholder.png
The platform model is built around useful actions: assign a task, start a shift, update progress, and combine the data into a client-ready report.
Operational activity
North Yard task assigned to M. Santos. Field notes, simulated photos, and progress updates build the project record.
Combined report
Task progress
72%
Labor time
Pending
Evidence
Building
YUKU Community will connect project conversations, contractor networks, field knowledge, and ecosystem announcements in one moderated layer.
Moderated threads for field questions, rollout notes, product feedback, and operational decisions.
Dedicated spaces for owners, supervisors, contractors, and project teams to coordinate around work.
A trusted directory layer for construction partners, service providers, and repeat jobsite relationships.
Reusable field practices, checklists, app rollout lessons, and training content for crews.
A commerce-ready storefront for field gear and YUKU branded supplies, structured so Stripe products can be connected later.
Leather pouches
Stripe-readyDurable jobsite pouch for pencils, markers, tags, and small tools.
YKU-LTH-POUCH-001
Safety vests
Stripe-readyPremium safety vest with YUKU-ready crew labeling and radio loops.
YKU-SAFE-VEST-001
Field kits
Stripe-readyClipboard, waterproof forms, tags, pouch, and starter crew labels.
YKU-KIT-FIELD-001
Work accessories
Mock productMarkers, cable tags, glove clips, and field-ready daily carry tools.
YKU-ACC-WORK-001
Branded gear
Mock productHeavyweight branded gear for site visits, demos, and crew events.
YKU-GEAR-HOOD-001
Content is CMS-ready, products are Stripe-ready, contact is Resend-ready, and the app is structured for Firebase-backed product surfaces.